HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #27  
Old Posted Sep 14, 2022, 3:00 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 9,318
Final touch up on the pavement for the traffic shift lanes of Adelaide St now going in. The temporary rail crossing gates are also installed and being tested today. Expectation is the traffic shift of Adelaide could happen within days. Also caisson and piling machines are busy on the west side where the old gas bar and car wash was and the new pumping station will be built.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 10:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.