Quote:
Originally Posted by JMKeynes
From the NYT article:
“The state’s plan does not address what would happen, if anything, with Madison Square Garden, whose operating permit at the site expires in 2023.”
|
Right, as they’ve repeatedly said, MSG is not involved in the development. They’re also not touching those 4-5 msf of air rights that sit above it.
And btw, that guy in the middle of that last photo is dreaming about a sweet, 2,000 ft tower. So that shows what they know.