Quote:
Originally Posted by OTownandDown View Post
Its a shame, they seem to have stalled out sometime around the carpenter strike. This lovely plywood window frame has been in place for over a month with no visible work being done elsewhere.
Yet the university says:


Quote:
Construction work is advancing well and on schedule
Summer construction work have started and includes sewers, water main, hydro, IT, gas duct banks and landscaping.
Sept 2023 is the target for opening it for use.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 11:36 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.