So weird that the corner floor plates are being put in later, and not along with the rest of each floor. Don't get me wrong, I'm glad to see them going in finally, but wondering why from a construction scheduling standpoint, they would opt to do that.
__________________
"Then each time Fleetwood would be not so much overcome by remorse as bedazzled at having been shown the secret backlands of wealth, and how sooner or later it depended on some act of murder, seldom limited to once."
Against the Day, Thomas Pynchon
|