Quote:
Originally Posted by J.OT13
I'm pretty happy with what will end up being a 7+ km bikeway between Westboro and uOttawa. With the central Transitway no longer in use, this is a good evolution for the corridor.
|
i've been thinking the same thing. between this, the albert/slater realignment by the library, and the general improvements along the length of each road, this is going to become an amazing east-west cycling corridor that will be more direct than taking the river multi-use pathway.