HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 3, 2022, 8:16 PM
WildCake WildCake is offline
Registered User
 
Join Date: May 2016
Posts: 1,071
Quote:
Originally Posted by rrskylar View Post
So doesn't there still being a weak link negate all the benefit's of raising it!?
Your comment is analogous to this: starting to patch a cracked basement foundation, it starts raining partway through the project and then water gets into your basement, and saying there was no point in starting the project.

The province has been slowly building it up since the 97 Flood. This isn't done overnight lol.

Our lovely PC government actually took the cheap way out as usual a few years ago, and opted for a roundabout route instead of raising a section near Morris, which you're griping about right now. So vote them out next election if you want to do anything about this.

https://www.cbc.ca/news/canada/manitoba/highway-75-detour-spring-flooding-1.5596553
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:23 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.