Quote:
Originally Posted by rrskylar
So doesn't there still being a weak link negate all the benefit's of raising it!?
|
Your comment is analogous to this: starting to patch a cracked basement foundation, it starts raining partway through the project and then water gets into your basement, and saying there was no point in starting the project.
The province has been slowly building it up since the 97 Flood. This isn't done overnight lol.
Our lovely PC government actually took the cheap way out as usual a few years ago, and opted for a roundabout route instead of raising a section near Morris, which you're griping about right now. So vote them out next election if you want to do anything about this.
https://www.cbc.ca/news/canada/manitoba/highway-75-detour-spring-flooding-1.5596553