City ownership vs NCC ownership? Views to and from? Not sure they ever really answered that question. Next to Pimisi was proposed by RVL when they submitted their LeBreton bid, but that was not considered in the competition since it was not part of the dedicated parcel.
Anyway, found one of the alternative designs for the library (non-winner architectural bid, I assume):
More on the website:
https://reveryarchitecture.com/projects/ottawa-central-library/