HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 16, 2021, 2:02 AM
mikevbar1 mikevbar1 is offline
Registered User
 
Join Date: Dec 2017
Posts: 216
[QUOTE=catcher_of_cats;9425063]
Quote:
Originally Posted by mikevbar1 View Post
The other end of the Blue line goes into Dundas, and this is more tentative because there is no precedent for service along this section historically speaking, so I figure this would probably be a later extension.

Not to be a Debbie Downer but building a rapid transit line into Dundas beyond extending the new LRT to University Plaza is frankly crazy even for fantasy map. The demand is simply not there. There is not even demand to have a bus run every 15 minutes straight down King Street to the new terminal at Mac even though they probably should. This section of the city has under 10,000 people, a high number (over 30%) who are seniors. There is no actual space for stations of any type, access is terrible (located partially up the escarpment), coordinating transit right-of-ways through the Bayview Junction is a non starter for the railways. There is also very little redevelopment potential in this part of the city plus very firm urban growth boundaries surrounded by conservation areas and farmland.

Extending the B line to University Plaza though is almost a no brainer if thousands of units, most of them geared towards students or affordable housing are constructed within a five minute walk of potential stations. Proper local bus routes can feed this terminal from anywhere in Dundas.

Remember that Dundas is a fractured community due to a lack of through streets between the various parts like Pleasant Valley, University Gardens, Highland Park, the Yorkview area, and the old town. It can take between 8-15 minutes to drive between these areas yet at the same time a driver can be at James and Main in 15 minutes from anywhere in Dundas.
Didn’t even think about that. I did consider the possibility of creating a fork off the main line into Dundas, but at that point it’s too much effort for what it’s worth. I know there’s the argument that you can induce demand and all, but I don’t see that happening here. Luckily it’s a mostly irrelevant part of this plan, and if the city were to ever consider expanding on top of the main sections then Dundas has track ready. That’s assuming there’s sufficient demand of course; otherwise, the busses will have to do.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Hamilton > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:05 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.