Quote:
Originally Posted by slowroll
I saw this morning that the westbound traffic had been moved back onto the north bridge, although in a reduced capacity. I would imagine that it will be fully opened in the coming weeks with the Oct 2021 opening date quickly approaching.
|
Was just going to post this, as I had to stop by the outlaws to pick something up for Mrs. Crazy Ham. They are doing the top lift on both east and westbound lanes. It is a gong show, going to be real interesting when the afternoon traffic starts up and the folks in Silverado do the U turn at McKevitt. Best to take Mcleod Tr south to get home.