Quote:
Originally Posted by JoeyColeman
|
I believe the Garden City Skyway replacement has been on the books for a year or two now.
Not sure I understand the priority on that one as the existing bridge isn't congested whatsoever, it must be an end-of-life item.
Basically MTO is going to build a new bridge (I believe) to the north of it, shift traffic onto the new bridge, extensively rehabilitate the existing bridge, then shift the eastbound traffic back onto the current bridge. It will result in two 4 lane bridges with large shoulders.
The whole project will probably cost close to a billion dollars.