HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Jun 4, 2021, 4:16 AM
craner's Avatar
craner craner is online now
Go Tall or Go Home
 
Join Date: Mar 2007
Location: Calgary
Posts: 7,429
Quote:
Originally Posted by J.OT13 View Post
No proplem!

Trillium is being extended 16 kilometers south, with the addition of 8 new stations (2 infill and 6 along the new route) including the 4 kilometer - 2 station airport link. Opening Fall 2022.

Confederation is being extended east by 12 kilometers and 5 stations, opening 2024, and west 15 kilometers and 11 stations, opening 2025.

The total Stage 2 scope includes 43 kilometers and 24 stations. The entire system will have 63.5 kilometers and 41 stations when Stage 2 is complete.



The Confederation Line and Trillium Line monikers will be phased out over time, replaced by colours and numbers. The system will be operated as a 4 line rapid transit network by the time all three extensions open.


https://www.railfans.ca/news/stage-2-lrt-service-patterns-for-o-train-lines-1-3
Thanks - massive expansion.
What is the overall budget ?
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 5:59 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.