Le Droit just published an article which stipulates how Le Groupe Heafey started the demolition of these buildings without any permits.

The main points of the article is that while the city issued a demolition permit in August, which was conditional on the builder obtaining a construction permit, none had been issued yet. And so, once the work started, the city issued a stop work order on March 12th, which was ignored and then, meragaliously, a permit was obtained on March 17th.

https://www.ledroit.com/actualites/gatin...es-bois-feda701ca52c8e027c032fbd4fc5f3ab

A second article in Le Droit also serves to illustrate the dysfunction within le Bureau de l'urbanisme. While the Municipal regulations call for a permit to be issued within 20 days, the delay now ranges between 180 to 200 days which explains why Le Groupe Heafey took matters in their own hands.

https://www.ledroit.com/actualites/gatin...blondin-5cc5d0061a2a0f5cbb639fa5dc5fe77a
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Gatineau
Forum Jump



Forum Jump


All times are GMT. The time now is 2:24 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.