Vaughn Metropolitan Centre
A recently released future rendering of Vaughn Metropolitan Centre north of Toronto, which includes CG Tower now u/c at 189m/60 storeys (red). Four of the towers near the right side of the render are built or topped out with more in the earlier stages of construction such as the 4 tower (40s to 59s) Festival Condo development. UT CG Tower UT
SmartCentres’ 175 Millway - 64 storey/206m residential and 21 storey office building. UT UT Claude Cormier park design. claudecormier.com
Mississauga
Exchange District Condos - 232m - 72s - Camrost-Felcorp - IBI Group - excavation
Worth a look: U of T Scarborough - Centennial College Vertical Farm
No news on a start but this is apparently still an active (and interesting) project I haven’t seen before. From the UrbanToronto thread: “U of T Scarborough and Centennial College are teaming up to establish the EaRTH District – an initiative aimed at advancing the clean tech sector through research, academic programming and commercialization. EaRTH, which stands for Environmental and Related Technologies Hub, will be located at U of T Scarborough and will be a knowledge and training hub in the Eastern GTA around the development of clean technologies.” Automation Gallery
__________________ circa 2008: home of the 3rd best skyline in N.A. +++circa 2028: home of the 2nd best skyline in N.A. (T-Dot)