HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 4, 2020, 4:55 PM
ASU Diablo ASU Diablo is offline
Registered User
 
Join Date: Jan 2013
Posts: 2,501
Quote:
Originally Posted by IndyAZ View Post
Parking Garage in Phase 2 would expand to take up the entire lot utilizing the single ramp off of Monroe. That way they can maintain the open air public walkways underneath the garage. The garage is also that large due to City agreement requiring them to build spaces the City lost when the public surface lost was lost.
This is some BS and so extremely frustrating.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Southwest
Forum Jump



Forum Jump


All times are GMT. The time now is 10:30 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.