Posted Nov 11, 2020, 4:57 PM
|
|
Registered User
|
|
Join Date: Jun 2016
Location: London
Posts: 9,308
|
|
Most of 8th floor walls are now installed. Should see 9th floor wall slabs going in next week. Some of the L2 walls have started under tower 2 now as well.
|