HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Nov 3, 2020, 12:07 AM
Zapatan's Avatar
Zapatan Zapatan is offline
DENNAB
 
Join Date: Aug 2009
Location: NY - Cali
Posts: 6,818
Quote:
Originally Posted by BuildThemTaller View Post
And it's not too crazy to think that Site I, 400N LSD and Tribune Tower East could all break ground in 2021.

Lending rates are stupendously low and there's reasons to believe infrastructure stimulus is a real possibility, too.
That'd literally be insane, don't wanna be overly optimistic but it is a real possibility.

Add 301 & 321 South Wacker to that list (potentially). Not sure about NEMA II but maybe that also.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 8:27 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.