Forming continues for the ground floor slab. Have started forming the ramp down to the L1 level. This will have the entrance off King St and be used for the public parking. The tenant parking entrance will be from York St and occupy the podium base levels above the ground floor lobby and commercial space. They have even started installing some of the ground floor steel rebar for the elevator/stairwell core.
|