HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 1, 2020, 12:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 27,631
Quote:
Originally Posted by Dundas View Post
I got an e-mail today from the City of Ottawa;

Zoning – 3030 St. Joseph Boulevard R

This is to advise you that the above‑noted matter will be considered by the City of Ottawa Planning Committee on Thursday, September 10, 2020.
Fingers crossed this will pass. Someone made a similar comment on the new Amazon Warehouse thread, but it's strange how that one went from proposal to approval to shovels in the ground within 2-3 months (still a lot of unknowns with that one) while other projects can take 6 months, a year, two years... The City's telling us that the Amazon project was absolute perfection while everything useless needs to be revised a million times until the architecture is knocked down to Ottawa levels of mediocrity.... Actually, that checks out.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Suburban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 2:50 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.