HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jun 15, 2020, 2:38 AM
Michigan48 Michigan48 is offline
Registered User
 
Join Date: Jun 2020
Posts: 14
I went by the site today and I noticed a sign that said Neuman Smith/Bedrock is attempting over a Zoom meeting on the 23rd to change the zoning to allow for a 535' tower that is 95' wide with 15 loading docks as opposed to the 450' tall tower that is 60' wide and with 6 loading docks. It also said the structure would bee about 946,000 square feet. This is interesting because it means Bedrock is still thinking the tower could be as large as originally proposed. To me that either means they somehow secured an anchor tenant or they think Quicken takes up enough space to built the tower at its original scale. I don't think they would even consider anything mostly speculative at this point considering the floundering commercial office market. It will be interesting to see if anything comes up at the meeting about leasing and a timeline.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 8:51 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.