HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted May 27, 2020, 7:16 PM
cairnstone cairnstone is offline
Registered User
 
Join Date: Jan 2010
Posts: 1,026
Quote:
Originally Posted by Metro-One View Post
That wasn’t a proposed budget devised by the government, that was a bid put forward by a private contractor.

The Golden Nears Bridge along with its viaducts, ramps, interchanges and roadway was under 1 billion, so not too hard to imagine.
true but not a fair comparison as it was done as a true global 3 P project. European labour was used to build the bridge and were housed in work camps and paid in euro. This project was at the height of foreign worker program. The rebar cages for large parts of the project was tied in Asia and only had a percentage was tied here after the unions cried fowl. If you ever watch some of the ega structure shows on discovery channel in Europe that was the way it was built. If I recall Translink had a significant claim against BF for quality of work and also Worksafe had major issues as hurt workers were flew home without reporting the injuries.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:58 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.