Posted Mar 12, 2020, 7:53 PM
|
 |
Registered User
|
|
Join Date: Mar 2008
Location: A place with bigger haboobs than yours
Posts: 625
|
|
Was at Park Central today. Here is a quick update:
Creighton moving right along, up to 6 floors
Millennium has lots of equipment on site, but was locked up with no workers. Could be because of weather, very wet, and everything at this point is in the ground.
Lots of work at Zipps. Looking forward to this.
|