HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 23, 2020, 6:31 PM
Mikey711MN's Avatar
Mikey711MN Mikey711MN is offline
I am so smart, S-M-R-T!
 
Join Date: Jul 2002
Location: Moved south to Austin, TX
Posts: 667
Quote:
Originally Posted by freerover View Post
Very Cool! Thanks for the info. So it sounds like phase 1 of the next CIP will be:

West Infill
Center Concourse
Tunnel to Center Concourse
Apron Expansion for CC
New Taxiway for West runway
Braided airport entrance


That sounds way more manageable and fundable than the proposed phase 1 in the MP.
My interpretation is that design work on the braided airport entrance is already underway and may be the first visible construction project from this list. This may take some coordination with TxDOT's project to extend/reconstruct the SH 71 FRs from 183 to Spirit of Texas.

Per your list above, then, the West Infill needs to come before the tunnel as shown. And other operational improvements in the existing BJT must be done before the CC can open. Ultimately, the CC project may or may not include the tunnel, but it sounded like they may all fall under one CMAR contract. But you may assume that the CC can't open without the tunnel.

All of this is obviously subject to change, but that's what I understand of the status of things right now.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump



Forum Jump


All times are GMT. The time now is 8:52 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.