HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 16, 2019, 8:46 AM
acottawa acottawa is online now
Registered User
 
Join Date: Aug 2009
Posts: 18,838
Quote:
Originally Posted by roger1818 View Post
Regarding getting through CPR's Toronto Yard, the yard today is a pale reflection of what it once was. Here are Aerial/Satellite Photographs of it "today" and in 1977. If you click on them to zoom in, you can see that they have torn up many of the tracks in the centre of the yard. I am sure it wouldn't be difficult for VIA to buy land from CP.
The Metrolinx Study said

Operations through CP’s Toronto Yard. The Havelock S/D ends at the eastern limit of the yard. To access the CP Belleville S/D all trains would have to travel through the yard at a maximum of 15 mph and be subject to conflicts with other train movements in the yard. This would have a serious impact on travel time and make the service unreliable.

It proposes various options to get around this, with varying degrees of cost and time.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:45 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.