HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Nov 1, 2019, 2:33 PM
BolliBatlu's Avatar
BolliBatlu BolliBatlu is offline
BANED
 
Join Date: Mar 2010
Location: बिर्सेपेंटे कुड्ल
Posts: 1,146
Land Transportation - Rail

Patrons say Yeshwantpur-Mangaluru tri-weekly schedule inconvenient

Southern Railway GM to conduct inspection

Metro rail feasibility study will be taken up in city soon, says Khader

New Mangalore’s coal handling boosts Palakkad rail division’s freight loading

Doubling, platform works at M'luru Central to be completed this year

Kateel says Railway Minister has agreed to extend Hassan-Tirupati train to Mangaluru
Quote:
Speaking at a function to flag off the new tri-weekly express train 16585/16586 between Mangaluru Central and Yeshwantpur here, Mr. Kateel said he has sought a chair car train between Bengaluru and Mangaluru.
Quote:
Stating that the rail network and related infrastructure in the Mangaluru region is set to witness a fast growth in the next five years, Mr. Kateel said works amounting to ₹70 crore have been taken up at Mangaluru Central.
Quote:
He claimed he succeeded in getting the regional office of the Konkan Railway in Mangaluru. The MP said the Union government has spent ₹1,500 crore for improving the railway sector in Dakshina Kannada in the last five years.
Quote:
Foundation stones were laid for railway platform works in Kabakaputtur and Bantwal Railway stations and for the foot overbridge at Subrahmanya Road station on the occasion. These works amounted to ₹8 crore.
Mangaluru to get three more trains soon, says Nalin Kumar Kateel
Quote:
MANGALURU: Mangaluru city will soon get three more express trains through extensions, including a new day-time train to Bengaluru, and Union Railway Minister Piyush Goyal has agreed to the proposals. Dakshina Kannada MP Nalin Kumar Kateel said on Thursday that the Tirupati-Hassan train and the Mumbai-Goa Jan Shatabti Express will be extended till Mangaluru apart from the new day-time train.
Quote:
The MP said the Mangaluru junction railway station will be upgraded into a world class railway station. “I have also been pursuing for an exclusive division for Mangaluru,” he added.
So, Mangaluru junction railway station will be an Worldclass Integrated Multi-Mode Transportation Hub? - Dist admin mulls over integrated transportation hub in Padil

Train 18 on Mangaluru-Bengaluru route soon – Piyush Goyal
Vande Bharat to Chennai, Hyderabad and Mangaluru
Quote:
BENGALURU: Union Railway Minister Piyush Goyal said that they are planning to operate Vande Bharat Express, a semi-high speed train, from Bengaluru to Chennai, Hyderabad and Mangaluru in coming days.
Speed trial on Kulashekar-Jokatte double line section today

ಮಂಗಳೂರು ರೈಲ್ವೇ ವಲಯ ಘೋಷಣೆಗೆ ಪ್ರಸ್ತಾವನೆ
Quote:
ರೈಲ್ವೇಯಲ್ಲಿ ಮಂಗಳೂರು ವಿಭಾಗ ಸ್ಥಾಪನೆ ಬದಲು ಮಂಗಳೂರು ವಲಯ ಘೋಷಣೆಗೆ ಪ್ರಸ್ತಾವನೆ ಕಳುಹಿಸಲಾಗಿದೆ. ಕೇರಳದ ಪಾಲಾ^ಟ್, ಮಂಗಳೂರು ಹಾಗೂ ಮೈಸೂರು ವಿಭಾಗಗಳನ್ನು ಸೇರಿಸಿ ಪ್ರತ್ಯೇಕ ಮಂಗಳೂರು ರೈಲ್ವೇ ವಲಯ ಸ್ಥಾಪನೆಗೆ ರೂಪುರೇಷೆ ಸಿದ್ಧಪಡಿಸಲಾಗಿದೆ. ರೈಲ್ವೇ ವಿಭಾಗ ಸ್ಥಾಪನೆಗೆ ತಾಂತ್ರಿಕ ತೊಡಕು ಎದುರಾಗುವ ಹಿನ್ನೆಲೆಯಲ್ಲಿ ನೈಋತ್ಯ ವಲಯ ಮಾದರಿಯಲ್ಲಿ ಮಂಗಳೂರು ರೈಲ್ವೇ ವಲಯ ಸ್ಥಾಪನೆಯಾಗಲಿದೆ ಎಂದು ಹೇಳಿದರು.
Huge railway laundry to come up at Ullal

ಮಂಗಳೂರು-ಮೈಸೂರು ಹಳಿ ವಿದ್ಯುದೀಕರಣಕ್ಕೆ ಹಸಿರು ನಿಶಾನೆ
Quote:
ರೈಲ್ವೇ ಮೂಲಗಳ ಪ್ರಕಾರ ಕೇಂದ್ರ ಬಜೆಟ್ನಲ್ಲಿ ಮೈಸೂರು- ಹಾಸನ-ಮಂಗಳೂರು ಮಾರ್ಗ ವಿದ್ಯುದೀಕರಣಕ್ಕೆ 316 ಕೋ.ರೂ. ಮೀಸಲಿಡಲಾಗಿದೆ. ಮಂಗಳೂರು-ಹಾಸನ ಕಾಮಗಾರಿ ಮೊದಲಿಗೆ ಆರಂಭಿಸಿ, ಬಳಿಕ ಹಾಸನ-ಮೈಸೂರು ಕೆಲಸ ಕೈಗೊಳ್ಳುವ ಸಾಧ್ಯತೆ ಇದೆ. ಜತೆಗೆ ಹಾಸನ -ಅರಸೀಕೆರೆ ಮಾರ್ಗವನ್ನೂ ವಿದ್ಯುದೀಕರಣಕ್ಕೆ ಪರಿಗಣಿಸಲಾಗಿದೆ. ಅಂತಿಮ ತೀರ್ಮಾನ ಪ್ರಕಟಗೊಳ್ಳಬೇಕಿದೆ. ಈ ಹಿನ್ನೆಲೆಯಲ್ಲಿ ಮಂಗಳೂರಿನ ಪಡೀಲ್ನಿಂದ ಬಂಟ್ವಾಳ, ಕಬಕ ಪುತ್ತೂರು, ಎಡಮಂಗಲ, ಸುಬ್ರಹ್ಮಣ್ಯ ಘಾಟಿ, ಸಕಲೇಶಪುರ-ಹಾಸನ ಹಳಿಯು ವಿದ್ಯುದೀಕರಣಗೊಳ್ಳಬೇಕಿದೆ.
'Expediting track doubling on Konkan rly my main focus'

Gazette notification needed to bring Mangaluru under SWR

40% of electrification on Konkan Railway network completed
Quote:
B.B. Nikham, KRCL regional railway manager, Karwar, said electrification between Thokur (near Mangaluru) and Bijoor (off Byndoor) — about 105 km in total — is almost complete and would be finished in a couple of months. Work between Bijoor and Verna (about 200 km) is under way, he said.
Effort to restart Mangaluru-Miraj train: Nalin

ವಿವಿಧ ರೈಲ್ವೇ ಅಭಿವೃದ್ಧಿಗೆ ಆಗ್ರಹಿಸಿ ನಳಿನ್ ಮನವಿ

Mangaluru Central Station gets one more foot overbridge

Ministry to consider merger of Mangaluru Rly. region with SWR

Meeting on DK rly and road infrastructure in Delhi soon

Konkan Railway likely to be electrified 100% by Dec 2020

SWR proposes weekly overnight train from Mysuru to Karwar

Parallel track laid to restore rail traffic

Mangaluru Central railway station gets third foot overbridge

Activists demand new platforms at M'luru Central stn

Southern Railway slammed for delay in building more platforms at Mangaluru Central
Quote:
To another query on a world-class station at Mangaluru, the SR said it had sent proposal to the Ministry for the redevelopment of Mangaluru Central as of now. On the closure of goods shed railway yard and shifting it to Ullal, Mr. Shami said it cannot be done.

Responding to the demand for a road overbridge connecting the APMC at Puttur, Mysuru DRM Aparna Garg said the Railway was ready to do it under cost-sharing basis [total cost ₹12 crore].
Threat of permanent cancellation of service looms over Madgaon Express

‘Run slip coach service instead of Mysuru-Karwar weekly train’
Quote:
The ZRUCC member noted that delaying the only available train on the shortest route between Bengaluru and Karwar was not advisable. On the other hand, he said, there is not much demand for train service between Mysuru and the coast. The requirements of Mysuru region could be catered with the introduction of slip coach service where a few coaches could be attached to a train in Mysuru towards Hassan that could be reattached to Yeshwantpur-Mangaluru Central-Yeshwantpur tri-weekly express (16585/16586).
Rail connectivity with North Karnataka is more important to us than Mysuru. Why should we tour this city just to see one boring palace? Inspite of his all drawbacks our ex-CM cum ex-Petrol mnsiter had tried for Bijapur to Mangalore (via Gadag) and we should thank him for that though it turned out to be another false promise by him. No Mangaluru MP is trying to re-introduce Mangaluru-Miraj train. These trains are important to us because we have a good workforce from North Karnataka and even student population. This will help them. It will help in boosting North Karnataka tourism as Mangaloreans can visit best tourist places like Hampi, Badami etc via train.

Electrification on Konkan railway to be completed by December next

Konkan Rly to double rail track, upgrade 22 stations
Quote:
Konkan Railway Corporation Limited (KRCL) Regional Manager B B Nikam said that Konkan Railway will initiate the doubling of tracks and upgrade of 22 railway stations at a cost of Rs 4,500 crore.

Nikam told mediapersons in Udupi, on Tuesday, that the proposal was submitted to the Centre for approval and the proposal was returned for some corrections.

The mega project is part of the capacity doubling plan project. The upgrades of railway stations and doubling projects are expected to be completed by March 2020.
Mumbai trains likely to be hauled by electric locos up to Kumta by Dec.
Quote:
Corporation officials said that electrification of the route between Thokur near Mangaluru and Bijur, off Kundapur (105 km), is almost completed and the line may be energised by mid-October. Similarly, electrification work between Bijur and Kumta (75 km) is also fast progressing and is likely to be completed by November this year. With this, KRCL would have a completely electrified the line of about 180 km from Thokur to Kumta and some trains may be hauled by electric locos. Southern Railway, which has jurisdiction till Thokur, is already running many trains between Mangaluru Central and Thiruvananthapuram section hauled by electric locos.
Quote:
For running trains with electric locos till Kumta, KRCL needs uninterrupted power supply from Karnataka Power Transmission Corporation Ltd. (KPTCL) for at least one of the traction sub-stations at Mulki, Barkur or Senapura, officials added.
Thieves target copper cables of newly drawn overhead electrification system work

Vijayapura-Mangaluru train likely
Quote:
To re-connect North and Central Karnataka regions with the coastal belt, South Western Railway is mulling introduction of a daily train (No 06919/06920) between Vijayapura (erstwhile Bijapur) and Mangaluru via Hubballi, Arsikere and Hassan.
At last something useful may happen.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Asia-Pacific > India
Forum Jump



Forum Jump


All times are GMT. The time now is 8:22 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.