HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Sep 20, 2019, 6:09 PM
MonctonianSentinel01's Avatar
MonctonianSentinel01 MonctonianSentinel01 is offline
I Rise Again
 
Join Date: Mar 2016
Location: Moncton
Posts: 596
Quote:
Originally Posted by Franco401 View Post
They seem to have chosen the worst possible window in which to take the images

-Gaping hole for the new office building on Regent
-Gaping hole for the new residential building on Regent
-Sears still a huge eyesore
-Centennial building wing demolished, with no progress
-New office building on Carleton just a frame
-Gaping hole at the end of Queen with partial demolition for new residential
-Smythe Roundabout under construction
-New midrise of Connaught still under construction
-Connaught Street School still under construction
-Gaping hole for the DECH addition
-Wetmore Road extension still stalled
-Station Street building under construction
-Neill Street extension not complete
and...

there's a lot going on in Fredericton right now.
This will always be the case I'm sure. There won't be a point in time where nothing is happening. Those are the two Canadian seasons, construction and winter.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 3:10 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.