This is via an insider. For sake of confidentiality due to NDA contracts, I'll just post some quotes. Read between the lines.
In terms of when the designs will be revealed.
Quote:
|
I would expect by the end of summer.
|
By design wise:
AND
Quote:
inside source says prepare for disappointment.
expect a box with exterior set perimeter columns
|
Regarding base:
Quote:
|
the base of the building will be very interesting.
|
Not going to mention who it is for legal purposes.