HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #8  
Old Posted May 12, 2019, 12:38 PM
PHrenetic PHrenetic is offline
Registered User
 
Join Date: Jun 2016
Location: Ottawa
Posts: 1,029
Quote:
Originally Posted by J.OT13 View Post
I'm not too worried about longer trains. With the current configuration, we could go up to 18,000 phpd. That's Expo Line volumes (one way). We should be fine for the next 20 years.

They could even increase capacity to 24,000 phpd with the current configuration if they expanded the fleet and increased frequency to a minute and a half, though it might be cheaper to expand the trains and platforms. We also don't want to give people the best frequency possible and then take it away.

When it does happen, it could be tough to adapt Belfast unless they build new sheds on the Pepsi Site. Luckily, they have plenty of space to expand Moodie Yards.

I wonder if they might build a third yard for Confederation at some point in time?
Good Day.

Yep.
Moodie is supposed to have space in the plans for at approximately doubling storage capacity in Phase 3.
And although furthur expropriation for Belfast is indeed theoretically possible, as I mentioned elsewhere,
PepsiCo is a formidable opponent who seems to wish to retain their plant unless the terms are VERY beneficial.
And an expanded configuration would be rather awkward, but possible.
Overall, I think that the final Moodie would provide sufficient storage capacity, unless future considerations change extensively. IMO.

EnJoy.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:40 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.