Quote:
Originally Posted by bomberjet
I thought it said start construction late 2020 finishing November 2023. Seems long to me for a bridge. Whatever.
|
Construction would likely start Nov/Dec 2020 - so end of year. Build through 2021 and 2022 - two years, not very long really. 2023 will be finishing work and landscaping.
Quote:
Originally Posted by bomberjet
I'm also not sure what they referred to as cost effective. That would lead me to believe they're re-using the existing piers. If they're building new piers, what does that mean?
|
They will build two new bridges, one on either side of the existing structure. It will be the same type of construction as was done at Hwy 1 and the Floodway by Deacons corner.