HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Buildings & Architecture, Urban Design & Heritage Issues


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #14  
Old Posted Aug 15, 2018, 3:46 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 8,865
Major milestone today with the lifting back of the bridge structure back onto the piers.

When they finish the work and put it back into service the city needs to start on the retaining wall replacement like they did south of the bridge. The same work is really needed north towards Oxford St. It is crumbling and broken with small trees growing out of it.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Buildings & Architecture, Urban Design & Heritage Issues
Forum Jump



Forum Jump


All times are GMT. The time now is 5:53 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.