Quote:
Originally Posted by Dengler Avenue
I heard that bridging the gap between the 2 sections of A20 is no longer financially feasible...? If that’s the case, it’s really hard to see the widening happening. Even if that isn’t the case, one will have to wait until work on Route 185 is finished because that road is too important.
|
Yeah, they retired the A20 from Quebec Structure Program to benefit of prolongation A85. Our Prime minister promize to built the entire A20 if he will be elected in october, but a bridge of 600M$ on Trois Pistoles river to continue construction was one of the problems :/