HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #1  
Old Posted Jul 12, 2018, 2:58 AM
njcco njcco is offline
Registered User
 
Join Date: Feb 2011
Posts: 95
LONDON | The Diamond (100 Leadenhall Street) | 56 FLOORS| 248.2M

SOM-designed Diamond Tower Gets Approved for London


https://www.dezeen.com/2018/07/10/som-the-diamond-tower-london-56-storey-architecture/





The 56-storey London skyscraper designed by Skidmore, Owings & Merrill will feature public viewing galleries at its topmost levels.

Called The Diamond, the 248.2-metre-high tapered tower will be constructed at 100 Leadenhall Street, in the city's financial district.

The tower will stand next to Rogers Stirk Harbour + Partners' similar-shaped 224-metre-high Leadenhall Building – nicknamed The Cheesegrater.
New visuals released by investors London and Oriental show a wedge-shaped glass tower with a faceted exterior that forms a pattern of elongated diamond shapes.

Publicly accessible viewing galleries will span the building's top two floors. The 55th floor will have 360-degree views over London, while the 56th level will be a triple-height space giving views to the south and of Renzo Piano's Shard.

Over 900,000 square metres of office space will occupy the rest of the skyscraper's floors, along with shops and public spaces at the building's base

The Diamond will be built within a close-knit formation of towers known as the Eastern Cluster, which also includes Norman Foster's Gherkin.

Together with PLP Architecture's 278-metre tall 22 Bishopsgate tower, which is currently under construction, The Diamond will form the sides of a "mountain" formation in the cluster, with Eric Parry Architects' 289.9-metre tall 1 Undershaft at it's peak.

Backed by Hong-Kong-based developers Lai Sun, the tower is estimated to take four years to build. Although existing tenancies at the proposed site aren't due to expire until 2023, the developers said that work will start as soon as buildings are vacated – meaning the building could be finished earlier than 2027.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump



Forum Jump


All times are GMT. The time now is 1:37 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.