Quote:
Originally Posted by The Chemist
Looks good. Wondering how much of a cut they're going to have to use on the Paskapoo section to get the grade down to a reasonable level.
|
Agreed. They are excavating some of the route already for aggregates for the SW section. The grade will be interesting at both ends; 5 or 6% maybe?