Posted Mar 20, 2018, 10:21 PM
|
|
Modulator
|
|
Join Date: Nov 2013
Location: Phoenix, AZ
Posts: 4,471
|
|
It's been a couple of weeks since I've checked up on the AZ Center renovation. I stopped by last night and there has been a ton completed in the last couple weeks.
The lower level concourse is nearly completed and the bricks, wood planking and planting are all done. The pedestrian bridges and stairways are almost complete as are the elevators. The entrance next to the theaters is nearly completed. Best of all, the entrance through the valet was completed and open. I was very impressed with this. Even though you walk through the valet, it is a very open and visible entrance from the street. The only thing I could think of to improve this would be to create a pedestrian crossing going straight to Sheraton to maximize the access. Outside of that, I think they are doing a heck of a job on AZ Center!
P.S. Sorry for not grabbing pics this go around.
|