HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Feb 28, 2018, 5:25 PM
mitchellk12's Avatar
mitchellk12 mitchellk12 is offline
Moderator
 
Join Date: Sep 2015
Location: Nanaimo, British Columbia
Posts: 677
Quote:
Originally Posted by Crisis View Post
The plan is to move both the hotel crane and the condo crane over to the office site. The timing should work well, as they will be finishing on those projects as formwork begins at the bottom of the office parkade excavation.

i didnt think the office tower would need 2 cranes? i was going to think one of the "jib arms" would have an extra section or two added to cover the whole surface of the office tower.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:59 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.