Dec. 19 2017 pictures:



^^^^ Forming the 14th floor. Tie-back installed on gray crane. By my rough calculation they completed 12 condo floors in approx. 16 weeks, or approx. 9.5 days per floor.

A few days ago I noted they were excavating along the east side of the parkade. The hole is not all that big and is now covered with some tarps. So its probably not a big issue (unlike last time they did this).



^^^^ Construction elevator going up on the north side of the hotel. There is a surprisingly large pile of dirt accumulating from the office tower parkade shoring. No digging yet.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 1:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.