HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Dec 1, 2017, 6:04 PM
Drofmab's Avatar
Drofmab Drofmab is offline
Registered User
 
Join Date: Aug 2008
Location: Regina
Posts: 1,063
Quote:
Originally Posted by TechnicalRecession View Post
It also looks like there are some renovations going on in the former Bank of Nova Scotia/Federal government building on Hamilton/11th, anyone have the scoop on that?
$7.5million 'restack' of the building, and moving in a couple new federal tenants.

As time has progressed, groups have been moved into the building & teams, departments, etc are broken-up & scattered around. The ScotiaBank space is being used as the construction site office, while the top few floors (construction in these spaces is visible from the outside) & basement are currently being renovated. Tenants formerly in those areas are in swing space. When the top few floors are done, tenants for the next few floors will move into the top floors, some other tenants will move into swing space, etc... until the project is done (early 2019). The empty lot between the building & the Delta is being used for construction parking & waste materials.

Ultimately, the main level will be reconfigured to better accommodate Service Canada.

Since the building is federally-owned, I suspect this project will also see federal tenants leave some of the smaller spaces they're renting around downtown.
__________________
@drofmab

Last edited by Drofmab; Dec 1, 2017 at 6:22 PM.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 5:26 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.