HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > General Discussion


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #24  
Old Posted Nov 2, 2017, 5:05 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by Alex Mackinnon View Post
That would basically be pointless. The dam height hardly changes the cost if you'd have to build it for the eventual raise. The foundation and generators would all have to be the same, but not properly optimized for either scenario.

It would basically be the same cost, and pay back at however much slower it produces power.

The reduced flooding would result in a short stretch of non-flooded river between a reservoir and the Peace Canyon Dam. Who wins in that scenario?
There's really nobody winning with any scenario. More like how do we lose the least...
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > General Discussion
Forum Jump



Forum Jump


All times are GMT. The time now is 11:08 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.