HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Oct 25, 2017, 3:55 PM
MrSlippery519 MrSlippery519 is offline
Registered User
 
Join Date: Dec 2010
Posts: 1,178
Quote:
Originally Posted by GreatTallNorth2 View Post
I'm not going to lie, I can't get very excited about our rapid transit plans. Should the entire plan be ditched and we start from scratch? I wish we would have done what K/W has done - instead of building 2 lines of bus transit, build one LRT line at a time. Do it smaller and do it right and then build on that. We have watered down the original plans so much that avid transit proponents are not excited about it and anti-transit people will continue to try to kill it.
I honestly would prefer that, if the underpass portion of the LRT route was going to be the major cost and pain with the tunnel just say screw it and proceed with a single line from the airport to the Oxford/Wonderland mark. Then later on add a north/south route.

Short term it would not be ideal however it would still solve a major need and LTC could improve the North/South routes accordingly.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 8:04 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.