Posted Sep 3, 2017, 11:28 AM
|
|
Registered User
|
|
Join Date: Jan 2009
Posts: 914
|
|
As part of the B concourse renovations is the airport planning on building a hammerhead at the end of the pier designer specifically for ground loading regional aircraft? I know back before the international terminal project took shape the hammerhead was planned to to expand US and international ops. I think converting the plans for regional use by Jazz, Encore and CMA would make the most sense in the long run.
|