Posted Aug 29, 2017, 8:26 PM
|
|
Registered User
|
|
Join Date: Aug 2011
Posts: 211
|
|
Quote:
Originally Posted by bomberjet
My Hydro comments are related to ongoing construction projects in the Province. So it's the right thread.
|
Quote:
Originally Posted by bomberjet
Hydro is a complete mess right now. They need to figure themselves out internally on the most basic of fronts. Never mind selling power to other nations. If any of you have dealt with Hydro before, they are 10 times worse right now since the 900 staff were let go. 10 times? Maybe 100 times worse, I don't know. They're extremely frustrating.
|
Quote:
Originally Posted by bomberjet
I think I've said this once before. I have colleagues who've gone from consulting to Hydro and it's a culture shock. From fast paced, charge out every hour you work or else. To hydro slow, do nothing for days type pace. I don't mean to keep ragging on hydro because they also have very good, smart people.
|
Ummm...No, not really.
|