Quote:
Originally Posted by alt_center
I usually cycle past the site on my way home from work. For the first time ever there were no workers on site at 5:30 on a Monday (Aug 21). In addition, they have excavated the east side back down almost to the footings after weeks of slowly back filling and compacting.

|
I'm told that the reason for the removal of the previously placed backfill is the lack of a filter fabric between the free-draining gravel adjacent to the waterproofing membrane and the clay backfill outside of the the gravel. As a result, all of that material needs to be removed and replaced, this time with the filter fabric separating the 2 different types of backfill material.