HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Aug 22, 2017, 3:29 PM
Crisis's Avatar
Crisis Crisis is offline
Registered User
 
Join Date: Apr 2010
Posts: 1,328
Quote:
Originally Posted by alt_center View Post
I usually cycle past the site on my way home from work. For the first time ever there were no workers on site at 5:30 on a Monday (Aug 21). In addition, they have excavated the east side back down almost to the footings after weeks of slowly back filling and compacting.

I'm told that the reason for the removal of the previously placed backfill is the lack of a filter fabric between the free-draining gravel adjacent to the waterproofing membrane and the clay backfill outside of the the gravel. As a result, all of that material needs to be removed and replaced, this time with the filter fabric separating the 2 different types of backfill material.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 2:08 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.