HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 16, 2017, 3:16 AM
Metro-One's Avatar
Metro-One Metro-One is online now
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 17,938
Quote:
Originally Posted by officedweller View Post
The RFP spec for the "ultimate capacity" for Canada Line was for 14,000 passengers per direction per hour based on regional growth projections.
That's versus 25-30,000 passengers per direction per hour for SkyTrain lines.

Richmond is not a "growth concentration area" because of the floodplain and earthquake risk, whereas Coquitlam and Surrey are on bedrock so they are growth concentration areas that will require higher levels of rapid transit service in future.

The Canada Line cars are fatter / wider than SkyTrain MKII/III cars (3.0 m versus 2.6 m) - so the perception of being small scale is exacerbated by the fat short trains. It's been discussed ad nauseum in other threads that the current level of service on Canada Line is no where near its ultimate capacity.
Don't bother explaining this anymore, the same people keep bringing it up no matter how many times it is explained.

Where I live in Japan the main rail line serves a corridor of about 600 000 people. If you averaged out how many rail cars service a station over an hour it has very similar capacity to that of the Canada Line currently. Funny how that is

There are other train lines around here that serves corridors as big as 250 000ish people and regularly run single car trains....

Of course there are other lines that also services areas of 300 000 or so people with 4 or 5 car trains, but those trains are manually driven and only arrive every 15 minutes or so (during peak times).

Vancouver is not Tokyo, or New York, or even Toronto, or Even Montreal. The Canada Line is also a very finite corridor when it comes to growth, unlike the the other two skytrain lines.

The Canada Line is fine. The only real issues to be had are adding more entrances and exits at the busier stations for better passenger flow and adding second platforms for Brighouse and YVR Airport.

Also last trains in most Japanese cities are as early as 11:59 PM, so skytrain also has some decently late service in comparison.

I must also laugh at the hilarious correlation made between our transit ridership and platform lengths. Currently, having 120 meter platforms would not suddenly increase our ridership. People are not avoiding using transit because skytrain only has 80 meter platforms. Seriously, where do people come up with this stuff?
__________________
Bridging the Gap
Check out my Flickr: https://www.flickr.com/photos/30634635@N03/with/29495547810/ and Youtube channel https://www.youtube.com/channel/UCV0_0h9qKlhxXFxuAey_q6Q
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:53 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.