HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 3, 2017, 3:11 PM
rbt rbt is offline
 
Join Date: Jun 2006
Posts: 1,387
Quote:
Originally Posted by caltrane74 View Post
Ottawa...
Isn't an option. They need their manufacturing plant for storage and maintenance of their own vehicles.

If you're implying the Eglinton yard could be used for manufacturing LRVs then that would require Eglinton's yard to be finished very soon. On the current timeline it's still years away from being ready.

The scale is also a little different; Ottawa is building 34 LRVs (18 months to 2 years for a single assembly line) for Phase 1 but Eglinton needs ~120LRVs for opening day; hard to do in 2 years (for 2021 finish) in a tiny facility.


Does anyone know how Ottawa will be growing the fleet for Phase 2? Will they do final assembly in Hornell?

Last edited by rbt; Mar 3, 2017 at 3:37 PM.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 12:47 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.