HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jan 12, 2017, 3:27 AM
wave46 wave46 is offline
Closed account
 
Join Date: Aug 2016
Posts: 3,875
Quote:
Originally Posted by Innsertnamehere View Post
Worst bottleneck I can think of is 404 southbound onto DVP, and 401 from 427 to 400 (especially 427 to 409)
That's because it goes from an 18-lane collector-express system in Mississauga to 8/10 through lanes at the 427/409, going back to a 12-lane collector-express system at Islington.

The 427/401 interchange is a mess. Unfortunately, it probably would cost $1 billion just to fix the interchange and connect the 2 C/E systems on the 401.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada
Forum Jump



Forum Jump


All times are GMT. The time now is 1:37 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.