Quote:
Originally Posted by MalcolmTucker
Not if one wants to build 40+km at once!
|
no, definitely not!
but I think it'd still be better to limit initial scope of green line and get full separation, than have the full line open a once. aurora park to quarry park is only ~20 km, and still a great start to the line
beyond ops savings from automation, being able to offer 90 second frequencies is well worth the cost of separation alone IMO
besides, all the other lines have opened in stages.. does green line have to be any different?