I just noticed that there are threads for the:
- Trillium Line (O-Train) Updates,
- Confederation Line | U/C | Opening 2018 (Stage 1),
- Western Corridor LRT Extension EA - Bayview to Baseline (Stage 2),
- Confederation Line East LRT Extension | Proposed (Stage 2), and even
- Kanata LRT EA - Bayshore to Palladium (Stage 3)
But no thread for the Stage 2 - Trillium Line South LRT Extension (much of the discussion has been done in the thread for the Existing Trillium Line).
This thread is for posting news, information and opinions about this stage 2 southern extension. News, information and opinions about the existing line, currently in operation should continue to be made in the
Trillium Line (O-Train) Updates thread.
The official web page for this extension is
http://www.stage2lrt.ca/where/south/.