Posted Oct 30, 2016, 5:56 AM
|
 |
Registered User
|
|
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,357
|
|
As per the new slides the route is actually not 100 but 200 kilometers and would require five bridges and two tunnels. I cannot believe that would be under 3 billion dollars that they estimate. That is crazy long and would only solve problem for Powell River, leaving Lower Sunshine Coast as is.
Interesting data on fjord depths on those slides. Many options call for floating bridges.
|