HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Sep 26, 2016, 4:52 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
Quote:
Originally Posted by mr90 View Post
Hello Everyone

As a buyer of PA East I have been following your thread for about a month now, figured I'd join in. Sounds like everyone who bought is getting excited to move in, myself included.

Based on what I saw on Wednesday with the elevator coming down. I'd say we are probably 3-4 weeks away from walkthroughs and 6-8 weeks from moving in, depending on whether city inspectors have been certifying the units as they are finished, or if they will certify them after the walkthroughs. I don't think the lobby necessarily has to be done before we can inspect our units, though it would be nice to see the whole thing as we would when we walk in every day.

This pretty much puts it in line with Concord's date of November 14th, though it would be nice if it were sooner.
I've been saying it for about 10 pages now, I would put highest probability on inspections during November and move ins starting December. Not sure why nobody is listening to me but *shrug* you can keep calling Concord every day and get the same evasive answer, or just be patient and get prepared for November/December.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 1:57 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.