HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Jul 7, 2016, 1:35 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
 
Join Date: Nov 2005
Posts: 4,703
The tracks between the POW bridge and the Trillium line have been severed with no plans to reconnect them since they will be at different levels. The Bayview bridge/station is also being built lower than it was, will it even have regulation clearance for heavy rail? The bridge across the Gatineau river is already overworked as a one way Rapibus bridge, it seems silly to add a parallel commuter train to the mix.

The tracks through Fitzroy have been ripped up, there's no way they can reinstall them without a huge cost. I doubt the tracks up to Chelsea have even been fixed since the past washouts, and there has been talk of turning it into a trail.

I think the best these guys can do is operate trains from Ottawa station to Arnprior, Smiths Falls and Alexandria at most.
Reply With Quote
     
     
End
   
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:55 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.