HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 14, 2016, 5:56 PM
bomberjet bomberjet is online now
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,285
Yeah they would be. I noticed they had rebar cages laying around which are now gone. Assume those went into the tube. I'm not an expert, but they would be the same used for the actual foundation. They would be testing the design capacity or something like that.

They may have sent cameras down the hole to check the bottom out. Not an expert on that either. Or maybe they sent a guy down there but you missed it. On the construction cam, I've seen many a people standing around the tube looking down.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:03 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.